2.The foundation of the unit should be solid and firm, preferably reinforced concrete, and the size should preferably be 100 - 200 mm from the bottom frame of the pump set to the periphery, with drainage ditches and cable ditches set up.
3.The unit should be adjusted by wedge or cushion block when placed on the foundation, and the levelness should be checked by level meter. After tightening the foundation bolts, re-check the levelness, and then grout the foundation bolts when appropriate. No gaps or air bags can be left during grouting.

4.The water pipes at the inlet and outlet of the unit shall be separately supported and firmly installed. Do not use fire pumps as pipe supports. And take measures to prevent the fire pump import and export load is too large, the inlet pipe without air bag phenomenon.
5.Be sure to embed the foundation bolts of the proper size into the concrete and then fix the base of the pump set on it.
6.After the pump set base is installed on the foundation to ensure stability, connect the pipelines. Please pay attention to the position of the inlet pipe and the outlet pipe and follow the principle of low inlet and high outlet. The main pipeline below is the water inlet pipe and the main pipeline above is the water outlet pipe.
When the electric pump fails or the mains power is cut off, the diesel engine pump will work.